Contact us
case study · OT baselining

OT baselining before the first restrictive rule

Verified communication baseline per environment and restrictive rules deployed without production impact.

Client
Global luxury group
Sector
Luxury-goods manufacturing
Engagement
Network and OT Segmentation Assessment
Frameworks
NIST SP 800-82r3 · ISO/IEC 27019
the challenge

Manufacturing OT networks needed tighter controls, but nobody had a verified picture of which machines needed to talk to what. Blocking the wrong flow would stop production.

what we did

We analysed asset communication baselines, mapped application requirements with the equipment vendors, and validated every new flow in the traffic logs before deploying restrictive rule sets. Controls were aligned with NIST SP 800-82r3 and ISO/IEC 27019.

the matching engagement

Network and OT Segmentation Assessment

For plants, utilities and regulated sites where office IT and production or SCADA networks are not properly separated.

2 to 3 weeks · IEC 62443 · NIST SP 800-82

Scope and deliverables →

Dealing with something similar?

Thirty minutes with Adrian. You get an honest view of what to fix first, and a fixed written proposal if we are the right fit.

Book a scoping call